|
|
|
TRANSEC CL3 - is a three
cylinder unit designed for Transformers with an oil volume greater than 10,000
litres. Time to saturation will vary greatly and depend on the load
duty and hence temperature profile, as well as ambient conditions. Average
time to saturation on a 'wet' transformer will be in the region of 9 to 18
months. TRANSEC CL1
- is a single cylinder unit designed for Transformers with an oil volume
less than 10,000 litres. The CL1 is an economic way of drying a
smaller transformer, or to maintain a larger transformer that has already
been dried, in a dry condition.
|
|
Ian Bowden or James Shimwell
Telephone: (+44) 1306 743355
FAX: (+44) 1306 876768
TRANSEC (UK) LTD
Brickworks House,
Spook Hill,
North Holmwood,
Dorking, Surrey RH5 4HR
United Kingdom
General Information: transec@bowden-bros.com
|